SERVICES: Mandates
SAP Functional
|
2001.01 – 2001.04 |
SAP-PM: Assessment & Planning
Canadian National Railway Company (Fleet Management)
-
Fleet Management Process Mapping: review and documentation of business processes spanning the utility fleet lifecycle
-
Gap Assessment: evaluation of standard SAP-PM 4.6c functionality; identification of ERP functional gaps, required enhancements and associated development effort
|
2001.05 – 2002.08 |
SAP-PM: ERP Integration Lifecycle
Canadian National Railway Company (Mechanical – Motive Power)
-
Motive Power EAM subject matter expert: functional process team member for a North-American wide SAP logistics implementation (Relase 4.6c)
-
Business Process: review, process re-engineering, gap analysis
-
System Configuration: SAP Plant Maintenance (PM)
-
Functional Design: extensive enhancement of scheduled maintenance (Maintenance Plan), warranty management, and maintenance processing functionality
-
Data Conversion: extraction, cleansing, loading, validation
- Application Product Testing: cross-modular verification
- Project Management — Deployment Planning: Process & System Cutover; Risk Assessment, Mitigation, & Contingency; System Fallback; Rollout & Stabilization
- Knowledge Transfer: preparation and delivery of solution overview sessions to CN System Support personnel
- Training: power-user instruction, system and field support
|
2002.09 – 2003.06 |
SAP-PM Solution Rollout
Wisconsin Central Railroad Ltd. (Mechanical – Motive Power)
- Solution Adaptation & Rollout: of Canadian National�s locomotive EAM package to newly acquired Wisconsin Central Railroad
- Functional Team Lead: Mechanical / Motive Power (locomotive asset management)
- Project Team Lead: Deployment planning and execution
- Functional Design: automated wheel inspection report / verification system (Measurement Document and Notification functionality)
|
2003.07 – 2003.09 |
SAP-PM: Solution Optimization
Canadian National Railway Company (Mechanical – Motive Power)
- System Support: assist Information Technology operations staff address SAP Plant Maintenance inquiries and issues (Release 4.6c)
- Locomotive Solution Optimization: analysis of major end-user pain points; identification of improvement opportunities; scoping of enhancement design, development, and deployment effort
- Functional Design: development of custom SAP front-end to streamline data input, automate system coding, and incorporate real-time audit capabilities
|
2003.09 – 2004.11 |
SAP-PM: Application Development
RPECS International Inc. (EAM / Fleet Management)
- Feasibility Assessment: for the development and commercialization of a packaged SAP Fleet Management Solution
- Project Management: application scoping, conceptual and functional design, prototyping
-
Business Plan Development: marketing (research; segmentation), strategy (competitive analysis; application packaging, distribution, and support), financials (pro-forma: profit & loss, balance sheet, cashflow)
|
2004.09 – 2004.10 |
SAP-PM / PP: Assessment & Planning
BC Rail + Canadian National Railway (Mechanical – Wheel Shop)
- Integration Assessment: for the adaptation and rollout of an established SAP-PP wheel fabrication and refurbishment solution to a newly acquired facility; identification and documentation of business process variances, solution gaps, and change management issues
- Implementation Plan: outlining configuration, master data conversion, interim procedures, system cutover, technology (system communication and hardware), training, and stabilization activities
|
2004.12 – 2005.04 |
SAP-PM / BW: Assessment & Planning
Montreal Transit Corporation (Bus Fleet Management)
- Key Performance Indicators: identification and alignment of maintenance kpi�s supporting corporate asset reliability, availability, and productivity objectives
- Data Model Evaluation: of STM Bus Fleet solution�s capacity to provide required lead and lag performance metrics
- Gap Assessment: of standard SAP Plant Maintenance / Business Warehouse (Release 4.6c) info cube shortcomings
|
2005.06 – 2005.12 |
SAP-PM / RE: ERP Integration Lifecycle
Canadian National Railway Company (Real Estate Management)
- SAP-PM Configuration: (Release 4.7) of real estate management functions, including: technical objects, notification, order, availability control (budget)
- Functional Design: of enhancements providing PM/RE master data synchronization and automated environmental budget management (estimation, review, approval)
|
2006.02 – 2008.01 |
SAP-PM / MAM: ERP Integration Lifecycle
Canadian National Railway Company (Engineering – Track & Roadway)
- Application Assessment: of SAP xApp Mobile Asset Management capabilities to address railway track inspection process requirements (Release MAM 3.0 SR3)
- SAP-PM Configuration: for Engineering Track & Roadway asset management functions, including: technical objects (discrete & linear assets), notifications, work orders, etc. (Release ECC 6.0)
- Functional Design: of corrective maintenance automated processing & coding logic and user interface
|
2008.02 – 2008.08 |
SAP-PLM: Assessment & Planning
Huron PM Inc. (Engineering, Construction, & Operations)
- Business Process Modeling: Product Lifecycle Management (PLM); Maintenance, Repair, and Overhaul (MRO)
- Conceptual Design: integration of symbology-based middleware in business applications supporting the seamless transition from �design & build� (Engineering & Construction) to �maintain, repair, and overhaul� (Operations) asset lifecycle stages
|
2008.09 – 2009.06 |
SAP-PM: Assessment & Planning
National Railroad Passenger Corporation: AMTRAK (Mechanical)
- Business Process Modeling: Amtrak Mechanical business processes �As-Is� modeling and �To-Be� optimization
- Information System Requirements: review and evaluation of the EAM functional scope outlined by Amtrak Operations stakeholders
- Solution Blueprint: high-level solution design supporting the target (To-Be) solution functions
- Fit/Gap Assessment: identification, scoping, and ranking of Mechanical SAP solution gaps and associated development requirements (Release ECC 6.0, EP4)
|
2009.07 – present |
SAP-PM: Application Development
RPECS International Inc. (EAM / Fleet Management)
- Application Development: of SAP-PM centric Fleet Management packaged solution
- Assessment & Planning: project scoping, business process blueprinting, SAP gap assessment (Release ECC 6.0)
- Data Modeling: evaluation and generation of SAP Fleet Management configuration rationale
- Design & Prototyping: conceptual and functional design of SAP-PM Fleet Management extensions; application prototyping
- Note: evolution of the initiative originally undertaken in 2003.09
|
|
|
copyright © 2010 EquoVis International Inc. |